Bridges
Vaisigano Bridge Reconstruction Project
The bridge was completed in 2020 by using the pre-tensioned girder construction method. Generally, pre-tensioned girder is pre-manufactured in our specialized manufacturing facilities. However due to the geographical condition and the availability circumstances, the concrete abutment was simplified and manufactured in a makeshift factory locally and pre-tensioned simultaneously in batches to match the same quality as those manufactured in our specialized factory.
| Project Site | Apia City, Independent State of Samoa |
|---|---|
| Completion Year | 2020 |
| Client | Independent State of Samoa |
| Specifications | Bridge Length: 75m Span Length: 3x25m Width: 13m Girder Height: 1.1m Other: Salt Damage Protection |
| Construction Method | Pre-tensioned Hollow Girder Bridge |




