National Highway Network Interconnecting Bridges Construction Project (Package 01)
The bridges package was completed back in 2017. Out of 10 Bridges due for replacement, 4 bridges was scheduled to be constructed with post-tensioning method. 110 unit of post-tensioned girders were manufactured and the project consisting of 22 span was constructed and assembled by using a portal crane.
| Project Site | Southern Province of the Democratic Republic of Sri Lanka |
|---|---|
| Completion Year | 2017 |
| Client | Democratic Republic of Sri Lanka |
| Specifications | B01: Bridge Length 165m (5x33m) Width 21.2m B03: Bridge Length 60m (2x30m) Width 21.2m B04: Bridge Length 70m (2x35m) Width 21.2m B05: Bridge Length 120m (4x30m) Width 10.4m Girder Height: 1.7m-1.9m |
| Construction Method | Post-Tensioned Girder Component Bridge |